Location: Cape Portland Bay (30km NE of Gladstone in Tasmania)

The Musselroe Wind Farm is located at Cape Portland Bay, 30km north east of Gladstone, Tasmania.  Musselroe wind farm was a particularly challenging project due to the cultural heritage and environmental significance of the area.

We were appointed as the Electrical Balance of Plant contractor for this project.

The Musselroe Wind Farm construction involved:

  • The design, supply and construct the 110/33kV Musselroe substation and 33kV reticulation for 56 Vestas V90 wind turbines
  • Procurement and construction of 46kms of 110kV transmission line from Derby to the Musselroe Wind Farm which included 158 poles
  • Access tracks and hardstands for the 110kV overhead line works  and foundations
  • Turbine earthing and MV circuit cabling installation and terminations
  • The procurement and installation of:
    • Two 110/33kV 90MVA power transformers
    • Two 33kV 14MVAr synchronous condenser units with two 33/13.8kV transformers
    • Four 4MVAr D-Var Statcoms with 33kV/480v Transformers
    • Four 33kV 10MVAr Filter Bank systems
    • All 110kV & 33kV equipment including the WTG 33kV ring main units
    • 55kms of MV cable from the substation to the 56 WTG’s

Related Projects

Bald Hills Wind Farm

The Bald Hills Wind Farm is located approximately 10km south east of Tarwin Lower in South Gippsland, Victoria on a site of approximately 1750ha of...

View Project
Crookwell 2

CPP was appointed by TransGrid to construct the Crookwell 2 WF Grid Connection including the 330kV Transmission Line Cut-in. The Crookwell 2 WF construction involved:...

View Project
Hornsdale Wind Farm Stages 1, 2 and 3

The Hornsdale Wind Farm is located at Hornsdale, approximately 30km north of Jamestown in South Australia. When completed, it will consist of 99 wind turbines...

View Project
Copyright © 2024 © 2021 Consolidated Power Projects Australia Pty Ltd
Back to Top