Project Details

Client: TransGrid

CPP was appointed by TransGrid to construct the Crookwell 2 WF Grid Connection including the 330kV Transmission Line Cut-in.

The Crookwell 2 WF construction involved:

  • Supply delivery and construction of earthworks, Drainage, Access Roads, Minor and Major foundations including spill oil tank and transformer bund.
  • Installation of all primary, Secondary and communication systems including earthing, structures, equipment, cabling, Cable terminations and Microwave scope of work.
  • Design, Procure and construct Secondary system building.
  • Secondary System factory acceptance testing.
  • Secondary equipment site acceptance testing
  • Primary and Secondary Testing and Commissioning including assisting the client during energization
  • Fabrication, supply, assembly, erection, installation and cut-in of the one new 330kV new double circuit steel lattice RTE structure, stringing of Mango conductors and 2×7/3.75mm SC/AC OHEW including associated fittings and insulators.
  • Supply and Construction of tower footing and associated works. Test assembly of tower. Replacement of 3km of existing OHEW

Related Projects

Bald Hills Wind Farm

The Bald Hills Wind Farm is located approximately 10km south east of Tarwin Lower in South Gippsland, Victoria on a site of approximately 1750ha of...

View Project
Hornsdale Wind Farm Stages 1, 2 and 3

The Hornsdale Wind Farm is located at Hornsdale, approximately 30km north of Jamestown in South Australia. When completed, it will consist of 99 wind turbines...

View Project
Kiata Wind Farm

The Kiata Wind Farm project is a 29.7 MW wind farm consisting of 9 Vestas V126 3.45MW wind turbine generators (WTGs) connected into the National...

View Project
Copyright © 2024 © 2021 Consolidated Power Projects Australia Pty Ltd
Back to Top