Discover our projects across Australia
Current 2024 –
2025
Williamsdale BESS
The Williamsdale Battery Energy Storage System (BESS) will enhance energy security and reliability by storing renewable
Current 2024 –
2025
Mannum BESS
Developing a 100MW/200MWh battery to sit alongside the two existing solar plants at Mannum.
Current 2024 –
2025
Templers BESS
The Templers Battery Energy Storage System (BESS) is South Australia’s second-largest energy storage project
Current 2023 –
2025
Koorangie BESS
Developing a BESS with a maximum import export power of 185 MW and an energy storage capacity of 370 MWh.
Completed 2025 –
2025
SYTS-MLTS OPGW Replacement
OPGW stringing over live 500kV circuits on the SYTS–MLTS line—a first in Australia.
Build your future in renewables
CPP installed the iconic Tesla battery at the Hornsdale WF (World’s first ‘big battery’). We are at the forefront of a once-in-a-century energy transformation. Join us as we help to deliver Australia’s renewable future. We are currently installing and connecting the Waratah Super Battery, the largest battery project in the Southern Hemisphere. CPP is the leading installer of grid-scale battery energy storage systems (BESS) and boasts the largest in-house design and engineering team of any contractor in Australia.

Explore your potential at CPP
CPP offers a world-class career path. Benefit from excellent rewards, leading training and a diverse, inclusive workplace. We fully support our employees, ensuring growth, well-being and success in professional development.