Client: Maritime and John Holland
This project included the Bega Bypass HV Conflict Area Relocation and Street-lighting for Roads and Maritime and John Holland. The project included the design and installation of high voltage overhead and underground infrastructure and street-lighting for the Bega Bypass. This project commenced with Design in December 2012 and Construction was completed in November 2013.
Work on the distribution and transmission networks was carried out under outage arrangements with our authorized linesperson as the access recipients.
The works required extensive traffic management and working harmoniously with other subcontractors in a confined work site.
This project was delivered without quality non-conformances, environmental incidents or lost time injuries.
The Tamworth to Gunnedah 66kv Transmission Line project for Country Energy included the refurbishment of existing infrastructure and a new transmission line at Tamworth, NSW....
The scope of this project included the construction of a 33kv Transmission line which became the internal connection between the two halves of the Gullen...
We successfully installed OPGW on over 300 towers near Bathurst, NSW for Transgrid. This involved stringing OPGW on TL72 330kV/132kV Tower Line of 67 Structures,...