We successfully installed OPGW on over 300 towers near Bathurst, NSW for Transgrid.

This involved stringing OPGW on TL72 330kV/132kV Tower Line of 67 Structures, and the Installation of OPGW on TL949 132kV Pole Line of 270 Structures including Earth peak upgrades.

This project faced a few challenges such as difficult terrain and bad weather which caused significant delays and disruption to the program. To combat this, alternative sections were prepared in advance to allow for quick access to out of order sequence when required. We also proposed an Accelerated program with additional plant and resources to maximise efficiency and maintain cost.

Key Challenges:
  • Stringing OPGW on TL72 330kV/132kV Tower Line of 67 Structures
  • Installation of OPGW on TL949 132kV Pole Line of 270 Structures including Earth peak upgrades

Related Projects

Tamworth to Gunnedah 66kV Transmission Line

The Tamworth to Gunnedah 66kv Transmission Line project for Country Energy included the refurbishment of existing infrastructure and a new transmission line at Tamworth, NSW....

View Project
Gullen Range Wind Farm 33kV Transmission Line

The scope of this project included the construction of a 33kv Transmission line which became the internal connection between the two halves of the Gullen...

View Project
Bega Bypass and Street Lighting

This project included the Bega Bypass HV Conflict Area Relocation and Street-lighting for Roads and Maritime and John Holland. The project included the design and...

View Project
Copyright © 2024 © 2021 Consolidated Power Projects Australia Pty Ltd
Back to Top