Location: Near Bathurst, NSW
Client: TransGrid
We successfully installed OPGW on over 300 towers near Bathurst, NSW for Transgrid.
This involved stringing OPGW on TL72 330kV/132kV Tower Line of 67 Structures, and the Installation of OPGW on TL949 132kV Pole Line of 270 Structures including Earth peak upgrades.
This project faced a few challenges such as difficult terrain and bad weather which caused significant delays and disruption to the program. To combat this, alternative sections were prepared in advance to allow for quick access to out of order sequence when required. We also proposed an Accelerated program with additional plant and resources to maximise efficiency and maintain cost.
The Tamworth to Gunnedah 66kv Transmission Line project for Country Energy included the refurbishment of existing infrastructure and a new transmission line at Tamworth, NSW....
The scope of this project included the construction of a 33kv Transmission line which became the internal connection between the two halves of the Gullen...
This project included the Bega Bypass HV Conflict Area Relocation and Street-lighting for Roads and Maritime and John Holland. The project included the design and...