The 132kV Yass to Wagga Line Upgrade project was to replace the existing wooden H 132kV structures with new concrete monopole structures, replace the old 115km Banana conductor with a new Lemon conductor.
The activities for the project were to demolish and rebuild the existing power line, to the new standards. To do this we needed to assess the access routes and roads to each structure location, building roads and pads to facilitate the upgrade works. It included stakeholder engagement and liaising with landowners to access their properties.
The terrain from Yass to Wagga Wagga is mountainous and the route included ranges that had to be crossed. This meant building pads and accessing site with large construction plant was difficult at certain locations.
The Tamworth to Gunnedah 66kv Transmission Line project for Country Energy included the refurbishment of existing infrastructure and a new transmission line at Tamworth, NSW....
The scope of this project included the construction of a 33kv Transmission line which became the internal connection between the two halves of the Gullen...
This project included the Bega Bypass HV Conflict Area Relocation and Street-lighting for Roads and Maritime and John Holland. The project included the design and...