Project Details

Client: TransGrid

The scope of the Vales Point project was Tower Refurbishment on the Vales Point to Lake Munmorah 330kv Transmission Line for Transgrid.

This project involved the assessment of 11 Transmission Towers and then doing Bolt replacements, surface preparation and paint application to refurbish those towers.

Due to the nature of tower refurbishment, there was significant consideration put into the protection of the surrounding environment from lingering spray from the blasting unit. We looked at the weather conditions multiple times daily, changed our blasting units to the Torbo brand and worked with the most environmentally friendly products for the blasting and painting of towers making sure to use water-based environmental controls.

Key Challenges:
  • Tower Refurbishment
  • Bolt replacements
  • Surface preparation and painting

Related Projects

Tamworth to Gunnedah 66kV Transmission Line

The Tamworth to Gunnedah 66kv Transmission Line project for Country Energy included the refurbishment of existing infrastructure and a new transmission line at Tamworth, NSW....

View Project
Gullen Range Wind Farm 33kV Transmission Line

The scope of this project included the construction of a 33kv Transmission line which became the internal connection between the two halves of the Gullen...

View Project
Bega Bypass and Street Lighting

This project included the Bega Bypass HV Conflict Area Relocation and Street-lighting for Roads and Maritime and John Holland. The project included the design and...