Blyth West substation is located near the Blyth township in South Australia and connected to the Snowtown Wind Farm (Stage 2) via a 275kV mono-pole overhead line.
The Blythe West substation was constructed as a three circuit breaker mesh bus arrangement allowing for a future upgrade to a full breaker and a half configuration over two diameters with relative ease.
The Blythe West substation construction involved: